Fidrel

Facilities management

Fire safety register for apartment blocks and buildings in use

In an Irish apartment block, or any building in use, the fire safety register is the running record of the fire precautions: fire alarm tests and services, emergency lighting tests, extinguisher services, fire drills and staff training. Too often it is a printed log book in the panel cabinet that only the alarm engineer ever opens. This page shows how an owners’ management company, a property manager or a facilities manager can keep the register in Fidrel: an Irish folder for the records, recurring inspections with a frequency, a responsible person and a contractor, a log of every visit and a reminder before the next one falls due.

30 days free · No minimum term.

Facilities management in Fidrel on a laptop, tablet and phone, with the building overview, the asset register and open fault reports

Why fire registers fall out of date

One book in one cupboard

The log book lives beside the fire alarm panel, the agent works from an office across town and the directors never see it. When the alarm contractor changes, the new firm brings its own book and the history splits in two.

Several firms, several rhythms

The alarm company calls on its own cycle, emergency lighting is tested on another, extinguishers are serviced by a third firm and drills depend on whoever manages the building that year. Without one list of what is due when, gaps only show when someone asks for the records.

Fire doors belong to nobody

No specialist contractor looks after the fire doors in most blocks, so their checks are the easiest to forget, even though a broken closer or a door wedged open undoes the protection the door was fitted to give.

The five folders under 06 Fire safety register

The Irish facilities structure gives the fire records a top-level folder of their own, 06 Fire safety register, with five folders beneath it: Fire alarm log, Emergency lighting log, Fire extinguishers, Fire drills and Staff training. Each inspection created from a fire preset points at its folder, so the row in the register carries a link straight to the reports filed there. The fire safety certificate obtained for the building at design stage lives elsewhere, in a folder under 02 Building control, with the other completion documents.

Operations
Recurring inspections in Fidrel, each with its frequency, responsible person, contractor, linked asset, last visit, report folder and next due date

The three fire presets and what their labels mean

The Irish template offers three fire presets. Fire alarm test and service comes with an interval of three months and the contractor filled in as a competent fire alarm company; Emergency lighting test also comes with three months, carried out by a competent person; Fire extinguisher service has no figure, because practice differs, and waits for yours. Each is labelled Common practice, and the dialog says that its frequencies are common starting points and that the frequency set for the building by the enforcing authority or inspection body applies. Presets with a figure start ticked, and every figure can be changed to anything from 1 to 240 months before the inspections are added.

Open fault reports in Fidrel with priority, location, the person assigned, the due date and the status of each

Setting up the register in Fidrel

  1. Step 1

    Create the Irish facilities folders

    A project administrator creates the facilities folders once. On a project started from the Irish site they include 06 Fire safety register, with folders for the fire alarm log, the emergency lighting log, fire extinguishers, fire drills and staff training.

  2. Step 2

    Add the fire inspections from the template

    Under Statutory inspections, Add from template lists the Irish presets. Tick Fire alarm test and service and Emergency lighting test, which come with three months, and Fire extinguisher service, for which you enter the frequency yourself.

  3. Step 3

    Add fire doors, drills and training by hand

    Use New inspection with the type Other inspection for checks the template has no preset for, such as fire door inspections, fire drills or refresher training, each with a frequency in months, a responsible person and a contractor where there is one.

  4. Step 4

    Log each visit and file the report

    After each visit choose Log inspection, enter the date, who carried it out and the outcome, and link the service report filed in the matching folder. The next due date then moves on from the date of that visit.

Fire doors, drills and training

Fire doors have no preset of their own, and neither do drills or training. Add each as an inspection of the type Other inspection with a title that says what it is, such as fire door check, stair cores A and B, and give it a frequency, a responsible person and, where a firm does the work, the contractor. Link it to an asset if you keep the doors or the alarm panel in the asset register. From then on these checks appear in the same list as the alarm and lighting tests, sorted by their next due date, and they reach the same reminders.

A log of every visit

Each inspection keeps a history. Log inspection records the date it was carried out, who carried it out and one of three outcomes, Satisfactory, Satisfactory with observations or Unsatisfactory, with notes and a link to the report in the project’s documents. The next due date then moves on by the frequency from that visit, and the history lists every logged visit with its outcome, newest first. A visit cannot be logged with a date in the future. When a defect is found, for example an emergency light out on a landing, report it under Fault reports with its location, priority and photos, and assign it to whoever is fixing it.

Reminders before the next test

Every morning Fidrel looks for inspections due within the next 30 days. The person responsible, or whoever created the inspection if nobody is named, gets Periodic inspection due soon among their notifications, once for each due date. The facilities overview counts the inspections that are overdue and those due within 30 days, so a director or agent opening the building’s page sees straight away whether the register is up to date or slipping.

What the register does not prove

The register records what was done; it does not show the fire authority, an insurer or anyone else that the building is safe or meets a requirement. Frequencies in the template are starting points, and the frequency set for your building by the authority, your fire consultant or the equipment maker applies. Reminders appear as notifications in Fidrel; nothing is sent by email or text message. Fidrel is not connected to the fire alarm panel or the emergency lights and tests nothing itself. An Unsatisfactory outcome raises no fault report by itself.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Facilities management

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes, if you give them access to facilities management with the right to write there. Otherwise invite them to chosen folders, such as the fire alarm log, to upload their reports, and someone at the OMC or the agent logs each visit.