Fidrel

Documents & drawings

BIM take-off

Take off quantities straight from the IFC model. Fidrel calculates count and volume for every group from the geometry and reads area and length from the model’s quantity sets. Group by object type, type or storey and export to CSV.

30 days free · No minimum term.

Screenshot from Fidrel: BIM take-off
  1. Count and volume from the geometry

    Press “Calculate quantities” and the count and volume of every group are worked out from the model’s geometry, right in the browser.

  2. Area and length from the model

    Area, length and the model’s own volume are read from the IFC file’s quantity sets when the export includes them. If they are missing, the panel says so rather than showing an uncertain figure.

  3. Group and export

    Group by object type, type, storey or model. Clicking a row highlights the group in 3D, and the export gives a CSV file with one row per object.

Screenshot from Fidrel: By object type
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

BIM take-off

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Count and volume are calculated for every group from the model’s geometry. Area, length and the model’s own volume are read from the IFC file’s quantity sets when the export includes them. If they are missing, the panel says so rather than showing an uncertain figure.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term