Fidrel

Documents & drawings

Common data environment (CDE)

Issue documents to external parties and keep track of what was sent. A transmittal gathers selected documents in their current version, is locked when it is issued and can be emailed to the recipients as personal download links.

30 days free · No minimum term.

Screenshot from Fidrel: Common data environment (CDE)
  1. The right version to the right recipient

    Choose from the project’s documents. Each one is included in its current version, with number and revision, and the transmittal is given a suitability such as for review and comment or authorised for construction.

  2. Locked once it has gone out

    When the transmittal is issued, it is locked with the date and the sender. A later revision of a document does not change what was sent.

  3. Links instead of attachments

    The recipients receive an email with a personal link to a page where the documents are downloaded, with no account needed. The links are valid for 30 days, and the register shows whether the link has been opened.

Screenshot from Fidrel: Register
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

Transmittal sheet

You can show what was sent

Every transmittal has a number, subject, suitability, recipients and a list of the documents with their revision. The transmittal prints straight from the page, and transmittals can be searched by recipient or document.

  • Up to 50 recipients per transmittal
  • The recipient needs no account
  • Transmittals appear in the project’s history
Screenshot from Fidrel: You can show what was sent

Common data environment (CDE)

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

A transmittal brings together documents chosen from the project, each in its current version with number and revision, along with a subject, a suitability, recipients and a message.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term