Fidrel

Site operations

Site forms

Turn quality checks and inspections into forms that are completed on site. Build templates with check items, complete them on your phone and submit. A submitted form is locked and cannot be changed afterwards.

30 days free · No minimum term.

Screenshot from Fidrel: Site forms
  1. Templates with check items

    A template has check items of four kinds: a check (“Pass”, “Fail” or “N/A”), text, number and date. Start from the standard templates for your market or build your own.

  2. Complete and submit

    Choose a template, enter the location and who carried out the check, then answer item by item. Drafts are saved, and required items must be answered before the form is submitted.

  3. A locked record

    A submitted form is locked for everyone, administrators included, and carries its own copy of the check items. The list shows how many non-conformances each form contains.

Screenshot from Fidrel: Completed forms
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

On site

Three buttons per check item

On a phone each item stands on its own with the buttons “Pass”, “Fail” and “N/A” beneath it. Text, numbers and dates are entered in fields that fill the width of the screen.

  • Drafts and submitted forms kept apart
  • Search by form, location or inspector
  • Non-conformances counted in the list
Screenshot from Fidrel: Three buttons per check item

Site forms

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes. Build your own templates with check items, where each item has a heading and a type and can be required, or start from the standard templates for your market and change them.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term