Fidrel

Site operations

Site attendance

See who’s on site right now. Everyone checks in and out with one tap on their phone, and the project gets a list of who’s on site and a history of completed visits.

30 days free · No long-term contract.

Screenshot from Fidrel: Site attendance
  1. One tap in, one tap out

    The “Check in” button starts the visit, and the card shows when you checked in and how long you’ve been on site. “Check out” ends it.

  2. On site now

    The list shows who’s checked in and since when. A project administrator can check out someone who forgot to.

  3. A history of visits

    Completed visits are listed with date, name, time in and out, and duration, most recent first.

Screenshot from Fidrel: Site attendance
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

In the field

Checked in within a second

On a phone, check-in sits at the top of the page, with a full-width button. Below it are the list of who’s on site and the history.

  • Everyone checks themselves in
  • Everyone on the project sees who’s on site
  • Doesn’t replace your safety program’s sign-in sheet
Screenshot from Fidrel: Checked in within a second

Site attendance

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Everyone checks themselves in with the Check in button, on a phone or a computer. The card shows when you checked in and how long you’ve been on site, and Check out ends the visit.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term