How does Fidrel AI produce or change a schedule?
- Choose Draft a schedule in Fidrel AI, ask for it in the chat, or choose Draft it with AI on the Scheduling page.
- Choose Create schedule and it is saved as a new schedule.
- To change an existing schedule, ask for it in the chat.
- You get a comparison between now and after the changes, calculated by Fidrel’s scheduling engine.
- Save to the schedule saves the change as an entry in the history that can be undone.
Did you find the answer?
