Teams and organizations
API and integrations
Connect Fidrel to your systems – tell us what you need. Today Fidrel takes in e-invoices, models, drawings, estimates, and schedules in the formats you already use, and hands back the whole project whenever you want.
We’ll go through the connections you need and what works today.

The formats you already use
E-invoices in UBL and over PEPPOL, IFC models, DWG and DXF drawings, estimates from Excel and CSV, and schedules from MS Project.
The whole project in and out
The import center takes in a ZIP file or a whole folder structure, and the export center hands the project back as a ZIP file with its folders intact.
An open API – tell us what you need
There’s no open API or webhooks today. Tell us which systems you want to connect, and we’ll factor it into our work ahead.
Your files. All the way.
Walk through import and export in Fidrel: the import center, an IFC model in 3D, an e-invoice being read, and the export center.

In and out
Into Fidrel and out again.
Vendor invoices, models, the import center, the export center, and the common data environment – choose a part and see how it looks in Fidrel.
See the whole platformAPI and integrations
Frequently asked questions
Anything else on your mind? We are happy to help.
Talk to usNot today. Fidrel doesn’t have an open API or webhooks yet. Tell us which systems you want to connect – that’s what guides what we build.
UBL, CII, Finvoice, FatturaPA, and Facturae, including in a PEPPOL envelope, plus invoices as PDFs and photos. Invoices are uploaded to Fidrel – they aren’t received by email or over an invoice network.
Schedules from Excel, CSV, and MS Project XML, estimates from Excel and CSV. Schedules can be exported to Excel, CSV, and PDF.
IFC models are shown in 3D with clash detection and quantity takeoff, and DWG and DXF drawings right in the browser.
Yes. The export center hands back the project’s files as a ZIP file with the folder structure intact, and registers like estimates and invoices can be exported to Excel or CSV.
Where the formats are used
Your systems. Your formats.
Tell us which systems and formats you work with, and we’ll go through what works today and what’s needed.
- E-invoice, IFC, DWG, Excel, and MS Project
- Import and export of whole projects
- Open API: tell us what you need




