Fidrel

Platform overview

The whole project. One platform.

Estimates, schedule, documents, models and field work in the same project. Everyone works from the same information, in the office and on site, and each person sees what they should see.

30 days free · No long-term contract.

Screenshot from Fidrel: Platform overview
  1. One project, one record

    The estimate becomes the budget, the drawing gets its review and the daily log lands on the same project. Nothing has to be moved between systems.

  2. The right person sees the right thing

    Roles and permissions decide what each participant can open, down to single folders. Outside parties are invited to what concerns them.

  3. From first estimate to turnover

    The same project carries through procurement, construction and operations. The history stays when the phase changes.

  • Bechtel
  • Fluor
  • AECOM
  • Jacobs
  • CBRE
  • JLL
  • Cushman & Wakefield
  • BGRE

Everything included

Four areas in the same project. Each feature has a page of its own with pictures from the workspace.

Cost & finance

Project delivery

Documents & drawings

Site operations

In the office

From estimate to model on one screen

Build the estimate, lay out the schedule in a Gantt chart and open drawings and 3D models right in the browser. Nothing to install and nothing to sync.

  • Estimate, budget and actual costs in one table
  • Schedule with dependencies and milestones
  • PDF, DWG and IFC open in the browser
See BIM & 3D
Screenshot from Fidrel: BIM & 3D

In the field

The same project in your pocket

Daily logs, inspections, time and attendance are handled on the phone where the work is done. What is submitted is on the project the same moment.

  • Daily log with photos from the site
  • Forms and inspections filled in on site
  • Drawings and DWG on the phone
See Site
Screenshot from Fidrel: Site & daily log

Different roles. The same project.

Everyone on the team works in the same project, from the same documents and the same history. Pick your role and see how Fidrel supports your part of the work.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term