Compare drawing revisions by laying one over the other

A new revision arrives with a cloud or two and a line in the revision table, and everyone is expected to trust that nothing else moved. Laying the old and the new revision over each other shows every line that changed, clouded or not. Fidrel does this in the browser for PDF drawings and images: what exists only in the older revision turns red, what exists only in the newer one turns blue, and everything unchanged stays grey.

30 days free · No minimum term.

A floor plan PDF open in Fidrel’s viewer on a laptop, the same drawing’s versions on a tablet and a DWG on a phone

Why changes slip through between revisions

Changes outside the cloud

The designer clouds the change that prompted the revision, but a dimension elsewhere has also moved. Comparing by eye, nobody notices until the joinery arrives on site and does not fit.

Valuing the wrong difference

A quantity surveyor has to price what changed between the tender drawings and the construction issue. Without an overlay that means flicking between two PDFs and hoping nothing was missed.

No time to check every sheet

A revised set of thirty sheets lands late on a Friday. Most sheets have not changed at all, but nobody can say which without opening every one of them.

How the overlay works

Fidrel draws both revisions at one scale and looks at every point of the sheet. Dark ink found only in the older revision is shown red, as taken away; ink found only in the newer one is blue, as added; ink present in both is grey, and the paper stays white. The pages are lined up by their top left corner, as sheets of one drawing series normally are, and the file uploaded first counts as the older. The legend names both files, Only in the older and Only in the newer, so there is no doubt which colour belongs to which.

Documents, drawings & models
Drawing A-101 Level 1 Floor Plan.pdf, version 3, open in Fidrel’s viewer with page, zoom and fit controls

Any two PDFs, not only revisions of one drawing

The overlay works on any two PDFs, or any two images, open side by side, so it can just as well lay the architect’s plan over the services layout of the same floor. Pages are compared in order, the first with the first, the second with the second; where one file has fewer pages, the missing page counts as blank, which makes an added or removed sheet obvious.

The Versions tab of A-101 in Fidrel listing Rev B, Rev A and the original, each with a preview button

Comparing two revisions in Fidrel

  1. Step 1

    Open both revisions

    Open the current revision in the viewer, and the earlier one from the drawing’s Versions tab or from the register’s All revisions view, so that both sit as tabs in the viewer.

  2. Step 2

    Show them side by side

    Choose Show side by side, or press S, and pick the other revision under File on the right. The two revisions now sit next to each other in the same window.

  3. Step 3

    Lay one over the other

    When both files are PDFs, or both are images, an Overlay button appears above the file on the right. Press it and Fidrel draws both at the same scale and colours the differences.

  4. Step 4

    Step through the pages

    Move through the set with Previous page and Next page. A page where nothing changed says No differences on this page, and Side by side takes you back to the two files.

Where an overlay earns its place

Use it before pricing a revision, before accepting it, and whenever a recipient asks what changed since the issue they hold. With the register’s All revisions view it turns that question into a few clicks rather than an afternoon with two printouts and a highlighter. Changes worth recording can then be clouded in a review and, if they need a formal answer, raised as an RFI from the markup.

What the overlay does not do

DWG drawings cannot be overlaid, and neither can a PDF against an image: both files must be PDFs or both pictures. The overlay compares ink, not meaning: it does not list the changes, measure them or name the dimension that moved, and it is not saved as a report. Pale colour fills and light tints count as paper, so a change shown only in a light shade may not appear. Sheets are aligned by their top left corner, so a revision whose drawing has shifted on the sheet shows as changed almost everywhere.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Revision overlay

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes. Open both in the viewer side by side and press Overlay. What is only in the older file shows red, what is only in the newer shows blue, and what is in both stays grey.