Fidrel

Facilities managers

Take over a building you already know.

At handover, the as-built drawings, warranties and O&M manuals are already in one place. From there you manage plant and equipment, service contracts, inspections and fault reports right beside the documents.

30 days free · No minimum term.

A facilities manager with a tablet in front of an air handling unit in a plant room
  • Nothing missing at handover

    The checklist shows what the contractors have submitted, what is approved and what is still outstanding.

  • Nothing lapses unnoticed

    A notification arrives before contracts and inspections fall due, and the overview shows warranties about to expire.

  • Project members can report faults

    Whoever spots a fault reports it and follows the report. Operations sees everything in one place.

Working in Fidrel

  1. Handover checklist

    Create it from the template and track what the contractors have handed over.

  2. Asset register

    Record plant and equipment with service intervals and warranties.

  3. Warranties and contracts

    Add service contracts and warranties with end dates and notice periods.

  4. Statutory inspections

    Set up the recurring inspections with a frequency and a person responsible.

Handover

Handover as a checklist, not a binder.

Everything the contractors must hand over is an item to tick off: as-built drawings, O&M manuals, certificates and test records. Each item links to the document in the project, so what was submitted can also be found.

  • A ready template you can adapt
  • Linked to the project’s documents
  • Clear what is still outstanding
Screenshot from Fidrel: Handover

Asset register

Every asset in one register.

Register the building’s plant and equipment with tag, location, service interval and warranty. Warranties and service contracts sit alongside, with end dates and notice periods, and each asset’s IFC GUID from the model can be entered.

  • Tag, system and location
  • Service interval and warranty
  • IFC GUID from the model
Screenshot from Fidrel: Asset register

Statutory inspections

Inspections on time. Faults that get fixed.

Recurring inspections have a person responsible, a frequency and a history, and that person is notified before an inspection falls due. Fault reports run from report to resolution, with priority, assignee and contractor, and the person who reported it can see what happens.

  • A notification before the due date
  • Someone responsible for every inspection
  • From report to resolution
Screenshot from Fidrel: Statutory inspections

Different roles. The same project.

Everyone on the team works in the same project, on the same documents and the same history. Pick your role and see how Fidrel supports your part of the work.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term