Fidrel

Documents & drawings

Documents, drawings & models

All the project’s files in one folder structure, with preview and version history. Upload a new issue and it becomes a new version of the same document, while the earlier ones are kept. PDFs, images, Office files and DWG drawings open directly in the browser.

30 days free · No minimum term.

Screenshot from Fidrel: Documents, drawings & models
  1. New file, new version

    Document number, title and revision are read from the file name. If the number already exists, the file becomes a new version of the same document, and an identical file is skipped. Every version is kept with its date and change note.

  2. Open without downloading

    PDFs, images, Word, Excel, PowerPoint and DWG files are shown in the browser. Open several files in tabs or two side by side, and search the text of a PDF.

  3. The right people, the right folders

    Lock a folder or a document to selected people. Everyone who may open a file receives a notification and an email when it is uploaded, and deleted files can be restored for 30 days.

Screenshot from Fidrel: Folders
  • Balfour Beatty
  • Morgan Sindall
  • Kier
  • Laing O’Rourke
  • Wates
  • Landsec
  • British Land
  • Mitie

On site

Drawings in your pocket

Browse the folders, search by number or title and open the latest version on your phone. The status shows whether the document is work in progress, for review and comment or published for construction.

  • Search by title, number and discipline
  • Most recently changed files first
  • Zoom and page through PDFs and drawings
Screenshot from Fidrel: Drawings in your pocket

Documents, drawings & models

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

PDFs, images, Word, Excel, PowerPoint, DWG and DXF files are shown without being downloaded. Open several files in tabs or two side by side. IFC models also open directly in 3D.

Explore more of Fidrel

In depth

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term