The documents change while you comment
You spend an afternoon on a set of fabrication drawings, and by the time your comments go back the contractor has uploaded a newer set to the same place. Your remarks now refer to drawings nobody is looking at.
For architects and engineers
For the design team, a submittal is a question with a deadline: does this product, drawing or sample meet what we specified? The answer has to be clear enough that the contractor knows whether to order, revise or start again, and it has to stand up later when someone asks what was approved. This page is about the reviewer’s side of technical submittals in Fidrel: the four outcomes, the reasons that go with them, and the locks that stop the submission changing while you are looking at it.
30 days free · No minimum term.

You spend an afternoon on a set of fabrication drawings, and by the time your comments go back the contractor has uploaded a newer set to the same place. Your remarks now refer to drawings nobody is looking at.
An approval with comments is only useful if the comments travel with it. When the condition sits in an e-mail and the register just says approved, the fabricator builds what was submitted, not what was agreed.
A one-word rejection forces a phone call, a second round and a delay. Reasons written against the outcome let the contractor fix the right thing the first time, and show later why the decision was made.
Approve means the submission can be used as it stands. Approve with comments means the contractor may proceed, provided the comments are taken into account; Fidrel records the outcome as Approved with comments and keeps your text with it. Return for resubmission means the submission must be revised and sent in again before anything is ordered; the register then shows Resubmit. Reject means it is not acceptable, usually because a different product or approach is needed. Whatever your practice’s own wording, choosing between these four keeps every answer in the same vocabulary across the whole job.
Documents, drawings & models
Every outcome except a plain approval needs review comments before it can be sent back. The comments are stored with the outcome, the date the submittal was returned is recorded, and the history gains an entry for the status change. When the contractor resubmits, the old comments stay against the revision they were written for, so the next round starts from what you asked for, not from memory.

Step 1
A notice in Fidrel tells you that a submittal is awaiting your action. In the technical submittals register, the Awaiting my action filter lists every item where the next step is yours, with its response due date.
Step 2
Open the submittal and choose Start review. Its status becomes Under review, the documents of that revision can no longer be swapped, and the title, specification clause and type are locked while you work.
Step 3
Under Review outcome pick Approve, Approve with comments, Return for resubmission or Reject, write the Review comments to the contractor and choose Return submittal. Fidrel asks for comments unless the outcome is a plain approval.
Step 4
A returned submittal comes back as the next revision with its own documents. The earlier revision, its documents and your comments stay on the record, so you can check the new issue point by point.
The submittal names one reviewer from the design team. The panel offers Start review and the four outcomes to that reviewer, to project administrators and, where no reviewer has been named yet, to any member who can write in the project. If two people act on the same submittal at once, Fidrel refuses the second change and shows the latest version, so nobody approves something that has just been withdrawn or answered.
Once a review has started, the contractor can no longer withdraw the submittal to draft or change the documents of that revision; new documents can only be added to the next revision after a return. The title, specification clause and type stay locked under review and after approval. An approved submittal can then be closed, after which it cannot change at all.
The submittal’s review comments are written as text; markups on the drawings themselves are made separately in Fidrel’s drawing review, not in the submittal. No approval stamp is added to the submitted documents. A submittal has a single reviewer, so consultants who need to comment in turn agree their answer before the reviewer records it. What an approval means for responsibility for the design is set by the contract, not by Fidrel.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

The project system of the future connects people, documents and decisions. Discover the thinking behind Fidrel.
Read more
On site, answers need to be close at hand. Fidrel displays DWG drawings in your mobile browser, within the project’s document structure.
Read more
When everyone can see the next step, moving the project forward becomes easier. Fidrel brings activities, dates and reported progress together in a shared Gantt view.
Read moreFor architects and engineers
Anything else on your mind? We are happy to help.
Talk to usThe contractor may go ahead, but must take the reviewer’s comments into account. Fidrel records the status as Approved with comments and keeps the comments with it.
No. Fidrel requires review comments for every outcome except a plain approval, so a rejection or a return always tells the contractor why.
No. Once the review has started, the documents of that revision are fixed. Revised documents can only be attached to the next revision after you return the submittal.
Not in turn. Each submittal has one named reviewer. The other consultant can add a comment to the submittal, and the reviewer records the agreed outcome.
In the submittal itself. Each revision keeps its documents, and the history lists every status change and comment with the date and the person.
No. The notice appears in Fidrel, and the submittal is listed under Awaiting my action in the register until you have answered it.