Fidrel

DWG and DXF viewer

View DWG without AutoCAD, in the project’s own folders

Clients, site teams and subcontractors receive DWG and DXF files from designers who work in CAD, while they themselves have no CAD licence and no wish to buy one to look at a drawing. Fidrel opens DWG and DXF files in the browser, in the same folders as the project’s PDFs, Word and Excel files, so a drawing can be read, compared and checked without installing anything. This page compares reading a drawing as DWG with reading it as PDF, and says what Fidrel’s viewer shows and leaves out.

30 days free · No minimum term.

Fidrel on a laptop, a tablet and a phone, with PDF drawings, version history and a DWG drawing

The trouble with receiving DWGs

A CAD licence for one drawing a week

A client’s project manager is sent a DWG every few days and needs only to look at it. Installing CAD software, or asking the architect for a PDF of every file, both cost more time than the drawing is worth.

The PDF and the DWG disagree

The PDF was plotted last week and the DWG was updated yesterday. When the two are kept in different places, nobody is sure which one the site should be reading.

Copies on every laptop

Each download becomes another copy in someone’s downloads folder, and the next question about the drawing is answered from whichever copy happens to be open.

DWG, DXF or PDF: which to read

A PDF is the author’s plot: fixed, printed at a chosen scale, with the title block and the layers the author decided to show. It is what you build from when it has been issued for construction. A DWG is the drawing itself, with every layer, the model and the sheets, which is useful for checking what lies under a note or whether a services route was drawn at all. DXF is an exchange format for the same kind of content, often what a supplier or surveyor sends. Read the PDF for the issued information, and open the DWG when you need to look behind it.

Documents, drawings & models
A DWG floor plan in Fidrel’s viewer on a dark background, with a note that the view is unverified and a compatibility report link

What the viewer shows

Fidrel shows DWG and DXF files beside PDFs, images and Office documents, and you can open several files in tabs or two side by side. Within a drawing you can move between model space and the sheets, show or hide layers, and choose a paper, dark or monochrome background. The drawing is converted in your browser, and a converted drawing is kept only in that page’s memory, never stored in the browser.

A PDF floor plan open in Fidrel’s document viewer, showing the version, file size and upload date

Opening a DWG in Fidrel

  1. Step 1

    Keep the DWG in the project’s folders

    Upload the DWG or DXF into the folder where the project keeps its drawings. Access follows the folder’s permissions, so the drawing is seen by the same people as the PDFs beside it.

  2. Step 2

    Open it in the browser

    Click the file to open it in the viewer. Zoom and pan, choose Model or one of the sheets under Views and sheets, and switch the display between paper, dark and monochrome.

  3. Step 3

    Turn layers on and off

    Open Layers to show or hide each layer, or use Show all layers and Hide all layers. Switching layers off is the quickest way to read a crowded services drawing one system at a time.

  4. Step 4

    Check the compatibility report

    The viewer marks every DWG view as unverified. Open the Compatibility report to see processing warnings, objects not displayed and external references, and download the original whenever accuracy matters.

Getting a DWG to open well

The viewer reads DWG files saved in AutoCAD 2018 or 2013 format best. Ask the author to run AUDIT and PURGE before saving, to bind external references with BIND or eTransmit, and to export drawings from AutoCAD Architecture, MEP, Civil 3D or Plant 3D with EXPORTTOAUTOCAD so their special objects become ordinary lines and text. Keep the file under 32 MB and without a password. When a file will not show, the original can still be downloaded and opened elsewhere.

From viewing to a PDF

Viewing is often only the first step. In Drawing Studio a DWG, or a DXF, can be the base of a drawing that is plotted on a chosen paper size, measured at the scale of the file’s units, and exported or published as a PDF. Nothing is drawn on it there, and the DWG itself stays untouched. The guide to DWG to PDF explains what survives that conversion.

What the DWG viewer does not do

Fidrel shows DWG and DXF files but does not edit them, and the view is an interpretation that may leave out or simplify content. Filled areas are shown filled, but 3D solids are not shown, so ask for a PDF of the drawing as well when its appearance matters. A layout shows what its viewports see, but viewports turned off, without a size or view, or with a 3D view are left out. Files from AutoCAD R13 and older are not read. The DWG must be uploaded to a Fidrel project to be viewed; there is no viewer for files that stay on your own computer.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

DWG and DXF viewer

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes. Upload it to a project in Fidrel and click it: the drawing opens in the browser with its layers, model and sheets, with no CAD software installed.