Construction punch list process: from the walk to the closed item, trade by trade

At the end of a job, the items found on the walk have to reach the right trade, be fixed, be rechecked and be closed, and the team has to see what is still open. This page follows that loop in Fidrel and is exact about the parts it does not cover, such as plan pins and signatures.

30 days free · No long-term contract.

A coordination review in Fidrel on a laptop with numbered markups on a floor plan, the RFI list on a tablet and the review on a phone

Why punch lists stall at the end of a job

One long list for everybody

The architect’s list arrives as a single document with two hundred lines. Each subcontractor has to find its own items in it, and an item without a name next to it is nobody’s.

Items fixed but not rechecked

The trade says an item is done. Nobody walks back, so the owner finds the same scuff on final inspection and the contractor is reminded of a week it thought it had closed.

No view of what is still open

With the list in a spreadsheet and the status in text messages, the superintendent cannot say on Thursday how many items are open or which trade is behind.

Who writes the list depends on the contract

Many projects run a pre-punch, where each subcontractor walks its own work and fixes what it finds, followed by a walk with the owner and the architect. Who writes the official list, who accepts a fix and what a missed item costs are decided by the contract, not by the tool. Fidrel gives the team one place to keep the items once they exist: a record with an owner, a due date and a status that the whole project can follow.

Reviews, RFIs & issues
The Issues and deviations list in Fidrel with views for All, Mine, Open, Overdue and Closed, and columns for owner, due date and status

Grouping the list by trade

Every item can carry a company and a discipline. Type the company, such as the electrical subcontractor, into Search issues and the list shows its items; the search also looks in the title, the description, the category and the discipline. Items can point to a document in the project, to an RFI or to a view in a 3D model, so the context of a deficiency is one click away. Because the owner of each item is a project member, the Mine view gives every person their own list.

The Closeout page in Fidrel with items grouped in sections, each with a responsible company, a due date and a status of Missing, Submitted or Approved

The punch list loop in Fidrel

  1. Step 1

    Raise an item for each deficiency found on the walk

    Use New issue and fill in the title, a description, a category, the discipline, the company, a priority, a location typed as text such as a level and a gridline, a due date and an owner. One deficiency is one item.

  2. Step 2

    Hand each item to its trade

    The Company field names the subcontractor and Discipline names the trade, and typing either into Search issues lists that trade’s items. The owner is told in Fidrel when an item is assigned to them.

  3. Step 3

    Follow the list in the Mine, Open and Overdue views

    Start marks the work as begun and Resolve marks the item as fixed. The Open view lists what is not yet resolved, and Overdue lists the items past their due date, so the superintendent sees which trade is behind.

  4. Step 4

    Recheck and close the list in closeout

    Walk the resolved items and keep the record in the project’s Punch list back-check folder. In Closeout, the Punch list line moves from Missing to Submitted to Approved, with who approved it and when.

The recheck and the closeout list

The project structure has an Inspections and closeout area with folders for the Pre-final inspection, the Substantial completion inspection and the Punch list back-check, which is where the records of each walk can be kept. The Closeout page in facility management has a Punch list line with a responsible party, a due date and a status. Approving it stamps who approved the line and when, so the end of the list has a date on it.

What the punch list process in Fidrel does not include

An item is not pinned to a spot on a plan sheet: its location is text, such as a level and a gridline, and it is created in the browser with a connection. Resolve is the last button on an item, so an item that fails the recheck is raised again as a new issue instead of being reopened. Fidrel has no back-charge calculation and no sign-off by signature; a closeout line records who approved it and when.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Closeout

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Fill in the Company and Discipline of each item and name an owner. Typing a company into Search issues lists its items, and the owner is told in Fidrel when an item is assigned.