Import an MS Project schedule into a Gantt chart in the browser

A schedule that already exists in MS Project or in Excel should not be retyped to be shared. Fidrel imports a plan saved as XML from MS Project, an Excel or CSV sheet, or its own .json file, and adds the activities, groups and dependencies to the project’s Gantt chart. You see a preview first, and you check the links and the calendar before the team works in it.

30 days free · No long-term contract.

The Fidrel schedule with its Gantt chart on a laptop, tablet and phone, bars linked by dependencies and a red line for today

Why existing schedules are hard to share

One person owns the file

The schedule lives in a desktop file on the scheduler’s computer. Everyone else gets a PDF, so a foreman who wants to see why an activity moved has to ask for a new printout.

Retyping loses the logic

A plan rebuilt by hand in another tool keeps the bars and loses the links. The first date that changes no longer moves what follows it, and the critical path is a guess.

Excel plans with no structure

Many small contractors plan in a spreadsheet with a name, a start and a finish. It is a schedule in practice, but nothing in it knows about predecessors, groups or working days.

What is read from an MS Project XML file

For each task Fidrel reads the name, start and finish, whether it is a milestone, its outline level, percent complete, actual start and finish, deadline and notes. The links between tasks come across with their type, finish-to-start, start-to-start, finish-to-finish or start-to-finish, and their lag, which Fidrel converts to working days. The project summary task is left out, and times of day are dropped because an activity in Fidrel is a whole day.

Scheduling
The Fidrel Gantt chart with groups, milestones, dependency arrows, a Filter button, a View menu and a legend that includes baseline and critical path

Excel and CSV: heading names and dates

A column is recognized by its heading, in English or in the heading names MS Project uses, for example Task Name, Start, Finish, Duration, % Complete, Predecessors, Outline Level, WBS, Deadline and Notes. Without headings the first columns are read as name, start and finish. Dates may be Excel day numbers, ISO dates or day, month and year as a spreadsheet writes them; in the American edition the month comes first. Predecessors can be written as 3, 3FS+2 days or 5SS;7, which links to the rows with those IDs.

The details of one activity in the Fidrel schedule with its dates, progress, responsible person and links

Importing a schedule step by step

  1. Step 1

    Save the plan from MS Project as XML

    In MS Project choose File, Save As and the XML format. For Excel, make sure the sheet has a heading row with names such as Task Name, Start and Finish, and Predecessors if you have links.

  2. Step 2

    Open More and choose Import

    In the project’s Schedule, open the More menu and choose Import, then pick the XML, XLSX, CSV or .json file. Files other than .json can be up to 20 MB, and a .json file up to 1 MB.

  3. Step 3

    Read the preview

    Fidrel lists the activities it will add as the name, start and finish of each, and tells you how many rows without a readable start date were left out. Nothing is saved until you confirm.

  4. Step 4

    Import, then check links and calendar

    Press Import. The rows are added after the plan’s own rows. Open the dependencies of a few activities, check the Working calendar and its non-working dates, and assign the responsible persons again.

What to check after the import

The imported activities are copies, so the source file is untouched and the Fidrel schedule can diverge from it from the first edit. The project’s working calendar decides which days count, so a plan built on a different calendar can finish on another date. Compare a few key dates with the original, save a baseline once you are satisfied, and tell the team that the Fidrel schedule is now the one to update. Only the project’s administrators import.

What the import does not do

A .mpp file or a Primavera .xer file cannot be imported; save the plan from MS Project as XML first. Resources, costs, baselines and the source plan’s calendars are not read; the plan uses the project’s own working calendar. Fidrel exports to Excel, CSV, PNG, SVG, PDF and its own .json file, not to MS Project. People are not carried over, so assign the responsible persons again after the import.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Schedule import

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

No. Save the plan from MS Project as XML first and import that file. A .mpp file is not read, and neither is a Primavera .xer file.