RFI response time tracking for the project engineer

An RFI that sits unanswered holds up the work it was written about. Response time tracking starts with the basics: a named recipient, a deadline, and a list that shows what is overdue today. Here is how a project engineer or an architect keeps slow RFIs visible in Fidrel, and where the tracking stops.

30 days free · No long-term contract.

A coordination review in Fidrel on a laptop with numbered markups on a floor plan, the RFI list on a tablet and the review on a phone

Why slow RFIs stay slow

Nobody owns the follow-up

The RFI goes out by email, the architect says they will look at it, and the log has a deadline column that only gets updated at the weekly meeting. Between meetings, nobody knows which questions are late.

Late is a feeling, not a date

Without a deadline on each RFI, all anyone can say is that it has been a while. The argument over who held up the work then starts from memory instead of from dates.

Answers written against old drawings

By the time the answer comes back, the sheet has a new revision, and the answer may no longer fit the drawing it was written for.

What counts as late

An RFI is late when it is still Open, or sent back as Action required, and the day of its deadline has passed. An RFI due today is not late until tomorrow. Draft, Answered and Closed RFIs are never late. Late is worked out each time you look, from today’s date where you are, and is never stored on the RFI, so the Overdue count is right for the day you open the list.

Reviews, RFIs & issues
Fidrel’s RFI register with RFI-0005 to RFI-0008 and their statuses, and one open RFI showing its question, recipient and deadline

Where the recipient sees it

The recipient gets a notification in Fidrel when the RFI is opened, and finds it under Assigned to me on their home page, which flags overdue items and shows the due date. Open and Action required RFIs addressed to a person stay there until they answer. The person who asked is notified when the answer comes in.

A drawing review in Fidrel with a revision cloud, an arrow and numbered markups on a plan, and the comments of the participants with their status

How to follow up RFIs in Fidrel

  1. Step 1

    Send it with a recipient and a deadline

    Create the RFI with a Title, the Question, the Assignee / recipient, a Due date and a Priority, and link the drawings. Moving it from Draft to Open tells the recipient in Fidrel, while a draft tells nobody.

  2. Step 2

    Work the Overdue filter

    Choose Overdue in the Show menu above the list; it shows its count too. Each late RFI carries a red Overdue badge in the list and in its own header, so you know whom to call.

  3. Step 3

    Read the history and close the loop

    Open an RFI to read its History, with who did what and when. An answer moves it to Answered and notifies the person who asked; if more is needed, send it back as Action required, and close it when done.

Check the drawing before you answer or chase

Each RFI keeps the question, the linked drawings and documents, attachments, comments and the history. If the drawing has a newer revision than the one the RFI was raised on, the RFI says so and links to the new revision, so the answer can be checked against the current sheet. An RFI can also be created from a markup on the drawing, which brings the markup along.

Reading response time from the history

The history of every RFI shows each step with the name of the person and the date and time, so the days between opening and answering can be read straight from it. Use the deadline you set at the start as the target: the Overdue filter is what holds people to it.

What RFI tracking does not do

RFI emails are limited to one gathered email per person and day, listing RFIs due today, on the next working day or the day before; each person can switch them off in account settings. There are no averaged response times or turnaround reports. Fidrel keeps no record of when an RFI became late, because late is worked out from today’s date.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

RFI follow-up

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

It is Open or marked Action required and the day of its deadline is before today’s date where you are. Answered, Closed and Draft RFIs are never overdue, and nothing writes a late status to the RFI.