Section box and measure in an IFC model, in the browser

Most people open an IFC model to answer one question: what is behind this wall, how wide is that opening, how high is the slab. Fidrel’s viewer lets you cut a section, measure on the geometry, hide what is in the way and save the view as an image, all in the browser with nothing to install. This page walks through those review tools.

30 days free · No long-term contract.

IFC models in Fidrel on a laptop, tablet and phone, with the model tree and the 3D view

Why model review ends up in screenshots

The answer is inside the model

The duct clearance you need sits behind two walls and a ceiling. With a plain 3D view the only option is to orbit around it, and the screenshot you send shows everything except the thing you were asked about.

Measurements nobody can repeat

A dimension read off a screenshot has no points behind it. The next person cannot check it, and the number gets pasted into an email as if it were a dimension from a drawing.

Section plane or section box

The Section tool cuts the model with one plane. Choose from above for a plan cut or from the side or the front for an elevation, slide the cut through the model and flip it to look the other way. The section box is a different cut: it limits the model on all three axes at once, so you can isolate a room or a floor, either with the sliders or around the objects you selected. Only one cut is active at a time, because opening the section plane closes the section box. For plans and elevations to scale, switch the camera to Orthographic, which is a parallel projection without perspective.

BIM & 3D
A federated model in Fidrel’s 3D view with the model tree by level, the view cube and the toolbar for section, measuring and X-ray

Measuring on the geometry

A distance takes two clicks, and an area takes as many clicks as it has corners; click the first point again or press Enter to close the shape. The cursor snaps to corners and edges, so you measure between real points of the model. A sloping distance also shows its height difference, and an area shows its perimeter. Distances and areas can be undone or cleared.

A selected object in the model in Fidrel with its IFC class and attributes and the buttons for a deviation and a task

How to cut, measure and save a view

  1. Step 1

    Open the model and cut it

    Open the model in 3D, then use Section for a plane from above, from the side or from the front with a slider and a Flip button, or Section box to limit X, Y and Height. Around selection fits the box to the objects you picked.

  2. Step 2

    Measure what you need

    Choose Measure and click two points for a distance, or switch to Area and click the corners of the shape. The cursor snaps to corners and edges, and the reading appears in meters.

  3. Step 3

    Clear the view and save it

    Select objects and use Hide or Isolate, or turn on X-ray to see through. Then open Image, pick Full HD, 4K or 8K, tick Transparent background if you want it, and choose Save PNG.

Hide, isolate and X-ray

Hide takes the selected objects out of the view, Isolate hides everything else, and Show all brings the model back. X-ray makes the model see-through, so you can follow a pipe or a duct through a wall without hiding the wall. These are changes to how you look at the model, not to the model itself.

Saving the view as an image

The image can be saved as a PNG at Full HD, 4K or 8K width, with a transparent background when you want to place it on a drawing sheet or in a report. Measurements and sections are included in the image. If you raise an issue or an NCR from an object, the record carries the view with it, so the next person opens the model with the same camera, selection and section.

What these tools do not do

A measurement is a reading in the viewer, not a quantity for your estimate; quantities come from the Quantities panel. Readings are shown in meters and square meters, not in feet and inches. The viewer shows and checks a model but does not edit it or save a changed IFC file, and native Revit, Archicad or Navisworks files must be exported to IFC first.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

BIM viewer tools

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Open the model in 3D and choose Section for a single plane or Section box for a box around the area you care about, then move the sliders until the cut shows what you need.