Fidrel

Documents & drawings

Common data environment (CDE)

Issue documents to external parties and keep track of what was sent. A transmittal gathers selected documents in their current version, is locked when it’s issued, and can be emailed to the recipients as personal download links.

30 days free · No long-term contract.

Screenshot from Fidrel: Common data environment (CDE)
  1. The right version to the right recipient

    Choose from the project’s documents. Each one is included in its current version, with number and revision, and the transmittal gets a purpose such as for review or issued for construction.

  2. Locked once it goes out

    When the transmittal is issued, it’s locked with the date and the sender. A later revision of a document doesn’t change what was sent.

  3. Links instead of attachments

    Recipients get an email with a personal link to a page where they download the documents, no account needed. The links are valid for 30 days, and the log shows whether the link has been opened.

Screenshot from Fidrel: Transmittal log
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

Printed transmittal

You can show what was sent

Every transmittal has a number, subject, purpose, recipients, and a list of the documents with their revision. The transmittal prints straight from the page, and you can search transmittals by recipient or document.

  • Up to 50 recipients per transmittal
  • The recipient doesn’t need an account
  • Transmittals show up in the project’s history
Screenshot from Fidrel: You can show what was sent

Common data environment (CDE)

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

A transmittal brings together documents chosen from the project, each in its current version with number and revision, along with a subject, a purpose, recipients, and a message.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term