Fidrel

Site operations

Site attendance

See who is on site right now. Everyone signs in and out with one tap on their phone, and the project gets a list of who is on site and a history of completed visits.

30 days free · No minimum term.

Screenshot from Fidrel: Site attendance
  1. One tap in, one tap out

    The “Sign in to site” button starts the visit, and the card shows when you signed in and how long you have been on site. “Sign out of site” ends it.

  2. On site now

    The list shows who is signed in and since when. A project administrator can sign out someone who has forgotten to.

  3. A history of visits

    Completed visits are listed with date, name, time in and out and duration, the most recent first.

Screenshot from Fidrel: Site attendance
  • NCC
  • Peab
  • Itinera
  • Amazon
  • Google
  • Facebook

On site

Signed in within a second

On a phone the sign-in sits at the top of the page, with a full-width button. Below it are the list of who is on site and the history.

  • Everyone signs themselves in
  • Everyone on the project sees who is on site
  • Does not replace registers the authorities require
Screenshot from Fidrel: Signed in within a second

Site attendance

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Everyone signs themselves in with the Sign in to site button, on a phone or a computer. The card shows when you signed in and how long you have been on site, and Sign out of site ends the visit.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term