Site operations
Site & diary
Keep a site diary of what happens each day: work done, people on site, deliveries, weather and delays, with photos from your phone. An entry that points to a problem becomes a non-conformance with one tap, and every change is logged.
30 days free · No minimum term.

The day’s entries
An entry has a title, time, location and text, with fields for work in progress, number of people on site, plant, deliveries, weather and delays. The list is shown day by day.
From diary entry to non-conformance
“Raise non-conformance” fills in the title, text, location and responsible person from the entry and links the two in both directions. Every change is logged field by field with name and time.
Plan the work in the calendar
The project calendar brings together meetings and planned work by day, week or month. Those assigned to a piece of work accept or decline and mark it as confirmed, done or blocked.
On site
Write the diary where the work is done
Open the diary on your phone, write the entry and take the photos there and then. “Take photo” opens the camera, and several files can be added at once.
- “Take photo” opens the phone’s camera
- Photos, PDFs and documents up to 25 MB
- Filter by date, location and company

The site diary has two tabs. The Daily site reports tab collects one report per day with labour, plant, deliveries, visitors, weather and delays. The Diary entries tab takes work done, observations and delays, with photos and files.
Yes. Open the site diary in your phone’s browser, write the entry and take the photos there and then: Take photo opens the camera. There is no app to install.
Raise non-conformance fills in the title, text, location and responsible person from the entry and links the two in both directions. A variation can then be created from the non-conformance.
An entry cannot be deleted, and every change is logged field by field with name and time. You can always see what has been changed and by whom.
Entries are shown day by day with the most recent first. Search by title and filter by author, location, company, date and status.
Explore more of Fidrel
In depth
One project. One subscription. The entire platform included.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.
- 30 days free
- Unlimited participants
- No minimum term






