Fidrel

Site operations

Inspections & quality

Plan inspections, record the result and follow up what did not pass. An inspection has a responsible person, a due date, a result and photos, and a failed inspection becomes a non-conformance with one tap. The non-conformance is then tracked to close-out.

30 days free · No minimum term.

Screenshot from Fidrel: Inspections & quality
  1. The inspection and its result

    Every inspection has a type, date, location, responsible person and due date, and a result: passed, remarks or failed. Its status moves from planned to performed and approved.

  2. From inspection to non-conformance

    “Raise non-conformance” takes the title, text, location and responsible person from the inspection and links the two. The non-conformance has a category, priority and corrective action and is tracked from open to closed.

  3. The responsible person is told

    Whoever is made responsible for an inspection or a non-conformance receives a notification in Fidrel, and the open work is listed under “Assigned to me” on the Home page.

Screenshot from Fidrel: Inspections
  • Balfour Beatty
  • Morgan Sindall
  • Kier
  • Laing O’Rourke
  • Wates
  • Landsec
  • British Land
  • Mitie

On site

The inspection is recorded with photos

Open the inspection on your phone, take the photos with the camera and enter the result. The photos appear as thumbnails in the record, and every change is logged with name and time.

  • “Take photo” opens the phone’s camera
  • A result and remarks on every inspection
  • Non-conformances can also be raised from the 3D model
Screenshot from Fidrel: The inspection is recorded with photos

Inspections & quality

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Title, date, location, description, photos and files, company, responsible person and due date, inspection type, who checked it, result and remarks.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term