A long-term maintenance programme for a building

A long-term maintenance programme sets out what a building will need over the next ten years or more, element by element, and what each year is likely to cost. In Fidrel it is called the Planned maintenance programme: you start from a UK template for the type of building, enter your own quantities and costs, and see the spend year by year, ready to budget and to price as an estimate.

30 days free · No minimum term.

Facilities management in Fidrel on a laptop, tablet and phone, with the asset register and fault reports

Why long-term programmes go out of date

A spreadsheet that nobody updates

Many programmes begin as a spreadsheet attached to a surveyor’s report. Once the first year’s works are let it is rarely opened again, so the next budget is built on figures that no longer match what was done.

Deferred works disappear

When the roof works slip by two years, their cost has to move with them. In a static table the old figure is simply overwritten, and nobody can later see what was put off, or from which year.

The plan and the year’s budget never meet

The long-term plan and the annual budget are often drawn up by different people at different times, so the planned works and the money for them only meet when the invoices arrive.

Elements, actions and years

A programme covers one building over a number of whole years, from five to sixty. The UK template suggests ten, because landlords and managing agents usually plan ten years ahead, while housing providers often plan thirty. Every action belongs to a building element, from the roof, external walls and windows to lifts, fire safety and external areas, and is a replacement, a repair, a service or an inspection. It has a first year and an interval in years, or happens once if the interval is left empty, and a priority of high, normal or low. A table lists the actions by building element against the years, and a chart shows the cost per year.

The asset register in Fidrel’s facilities management, with plant by discipline, service dates and warranty end dates

A year becomes an estimate

Choose a year and select Make an estimate of that year. Fidrel creates a draft estimate named after the programme and the year, with one line for each action planned or done in it, described by element and action and priced from its quantity and unit cost, or its fixed amount, where you have entered one. In facilities management the estimate can then be approved as the operating budget for the year, and the year’s supplier invoices are followed against it line by line, month by month and by supplier. Once a year has its estimate, the programme opens it directly.

A draft estimate in Fidrel with cost items, quantities and unit prices in pounds, before it is approved

Building a programme in Fidrel

  1. Step 1

    Start from the UK template

    Enter the property, the year built, the type of building, the start year and the horizon. Fidrel fills in the elements, actions and typical lifespans for that type of building.

  2. Step 2

    Enter quantities and costs

    For each action give a quantity and a unit cost, or a fixed amount each time, and change first years or intervals wherever your own survey says otherwise.

  3. Step 3

    Mark the work as the years pass

    Mark each action done with its date and actual cost, defer it to a later year or skip it, so the totals keep matching what really happened to the building.

  4. Step 4

    Price the coming year

    Make an estimate of the coming year, add the detail the works need, and in facilities management approve it as that year’s operating budget.

What the UK template starts with

The four types of building are residential, commercial, public sector, and industrial and warehousing, each with its own actions and typical lifespans. The residential list, for instance, replaces roof coverings after fifty years, redecorates externally every seven and replaces communal boilers or heat pumps after twenty. Where the year built is known, a replacement falls due once its lifespan has run from that year, or in the programme’s first year if that point has already passed. The template gives no prices, because prices differ by place and year: you enter them.

Done, deferred or skipped

Each action can be marked in each year. Done records the date and the actual cost, which then counts instead of the planned figure. Deferred moves that year’s work to a later year of the programme, where it shows the year it was deferred from and can be deferred again. Skipped takes the work out of the year at no cost. The figures at the top, for the whole programme, the next five years and this year, follow every mark.

Statutory inspections beside the works

When a programme is created, the recurring inspections that the UK template marks as statutory can be included at their intervals, among them the annual gas safety check and the thorough examination of lifts every six months. The next one due is shown at the top of the programme with its year. The statutory list is a starting point from the template, not a statement of what the law requires of your building.

From your Workspace into the building’s project

A programme can be drawn up in your own Workspace before there is a project for the building. Move to a project then copies or moves it, with its actions and everything marked, into the facilities management of a project where you may write, beside the handover records and the asset register. Anyone who may edit a programme can export all of it to Excel, or the years on screen to a PDF with Fidrel’s document head.

What the programme does not do

The programme is not a PPM system: it raises no work orders by itself, dispatches nobody and has no technician app. An action that falls due becomes a fault report only when you choose Create a fault report from the action, and the report names the action and the year. Fidrel does not carry out a condition survey; the years come from the template’s typical lifespans or from your own surveyor, and you enter every cost. Actions in the programme send no reminders; the figures at the top show what falls due this year.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Facilities management

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

No. It plans works and their cost over the years. Faults are reported and assigned separately under Fault reports, and nothing in the programme creates jobs by itself; Create a fault report from the action turns a due action into a fault report when you decide it needs one.