How Fidrel labels the stages
Fidrel does not draw a line between the words; it gives a revision a status. Working, Shared, For review and Approved cover the design and construction stages, Issued for construction is the set to build from, and Record (as-built) is the status for the revision that documents what was built. The same word appears in a transmittal as the purpose As-built record, and a transmittal for that purpose can only send revisions whose status is as-built. The project’s closeout folders have a place for each: Record drawings, Record specifications and Record submittals sit together under Record documents.