Construction drawing log with current revisions

A drawing log should answer one question at any moment: which revision of each sheet is current. In Fidrel the log builds itself from the drawings uploaded to the project, grouped by discipline, with the current revision first and every earlier one marked superseded.

30 days free · No long-term contract.

Project documents in Fidrel on a laptop, tablet and phone, showing a PDF drawing and its revisions

Why drawing logs go stale

A log kept by hand

When the drawing log is its own spreadsheet, someone has to update it every time a sheet is revised. One missed row is enough for a crew to build from a drawing that was replaced a week ago.

No one can see what was superseded

With several revisions of the same sheet in circulation, nobody can tell at a glance which one is current without comparing file names in a folder.

A log that builds itself from the documents

The Drawings tab lists every drawing with its number, title, revision, status, revision date, scale and PDF sheet size, grouped and filtered by discipline. DWG and DXF files count as drawings by default, as do PDFs in drawing folders. Re-uploading an identical file is detected and skipped, so the log does not fill up with copies.

Documents, drawings & models
The drawing register in Fidrel with number, title, revision, status and revision date, grouped by discipline and showing the current revision

Current revision first, superseded sheets kept

By default the log shows the current revision of each drawing. Switch to all revisions to see the history, with earlier ones marked Superseded. An administrator sets the revision scheme (A, B, C; a, b, c; 0, 1, 2; 1, 2, 3; or P01, P02), and a revision the design team assigned is kept as written. Statuses run from Working and Shared to Approved, Issued for construction and Record (as-built).

The revision history of one drawing in Fidrel, with the current revision first and earlier ones kept

How the drawing log comes together

  1. Step 1

    Upload the drawings

    Upload DWG, DXF and PDF drawings to the project. The number, title and revision are read from each file name, and a file whose sheet number already exists becomes that drawing’s next revision.

  2. Step 2

    Fill in what the file name lacks

    Correct a number or title where the file name was wrong, enter the scale, and mark whether any other file is a drawing.

  3. Step 3

    Filter and export

    Show the current revision or all revisions, for the whole project or one discipline, then download the log to Excel or produce a PDF.

See what changed between revisions

Two revisions of a PDF or image drawing can be overlaid, with what appears only in the older or only in the newer shown in its own color, or viewed side by side. The Export center downloads each file’s current version as a ZIP with its folders, plus a CSV list of every file’s number, revision and status.

What the drawing log does not do

The number, title and revision come from the file name, not from the title block, and the scale is typed in by hand. The revision date is the day the revision was uploaded. The Sheet column shows a PDF’s ISO A paper size only; DWG files and US ARCH and ANSI sheets show a dash. Overlay does not work on DWG files, and there are no issue sets.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Drawing log

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

No. The log is built from the drawings uploaded to the project. The number, title and revision are read from each file name, and you only correct what the file name got wrong and add the scale.