Construction transmittal software

A transmittal is the record of what you sent, to whom and why. In Fidrel you issue drawings and documents with a stated purpose and locked revisions, each recipient gets a unique download link by email without needing an account, and the project sees which revision each emailed recipient holds.

30 days free · No long-term contract.

The transmittal register in Fidrel on a laptop, tablet and phone

Why transmittals get messy

Attachments with no record

Drawings go out as email attachments or file-sharing links. Months later nobody can show which revision the steel fabricator received, on what date, or whether it was issued for construction or only for review.

Superseded sets still in the field

When a sheet is revised, the people who hold the old revision are rarely told. Work continues on a superseded drawing because nobody kept a list of who received it.

A stated purpose and locked revisions on every transmittal

Every transmittal is numbered in the project, such as TR-004, and carries one of six purposes: For information, For coordination, For review, For approval, Issued for construction (IFC) or As-built record. For an IFC transmittal, only approved revisions and revisions already issued for construction can be sent, and the database checks this at issue. Once issued, the transmittal cannot be changed, so the record of what went out stays exactly as it was sent.

Common data environment (CDE)
Fidrel’s transmittal register with numbered transmittals, their purposes, recipients and the documents sent

Unique links for people outside the project

Recipients need no Fidrel account: each gets an email with a unique link to the documents, valid for up to 30 days. The transmittal log shows each recipient as Sent, Opened or Not opened, and recipients can confirm receipt by entering their name. A transmittal can also be printed from the browser for a paper record.

A new transmittal in Fidrel with subject, purpose, recipients, message and the documents with their revisions

How you issue a transmittal in Fidrel

  1. Step 1

    Pick documents and a purpose

    Choose current revisions and the purpose, from For information to Issued for construction (IFC) or As-built record. Only revisions in the Shared or Published state can be issued.

  2. Step 2

    Add the recipients

    Enter each recipient’s name, company and email, or add people from the contact register or the project team. Issuing locks the transmittal and the exact revisions it lists.

  3. Step 3

    Send and follow up

    Fidrel emails each recipient a unique download link. You see who has opened it, recipients can confirm receipt, and when a revision is superseded you can notify up to 50 holders at once.

Who holds which revision

The Who holds which revision view lists, per document and recipient, the revision that was sent, when the link was opened and confirmed, and whether a newer revision has replaced it. In one step you can email up to 50 recipients holding a superseded revision, and their link page names the revision that replaced it.

What transmittals do not do

Recipients can download and confirm receipt, but they cannot reply, comment or upload documents back. Links expire after a fixed 30 days and are not password-protected. Opened means the link page was opened, not that each file was downloaded. There is no ZIP download for recipients and no export of the transmittal log, and Fidrel does not claim ISO 19650 compliance.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Transmittals

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

No. Here a transmittal is the record of drawings and documents you issue to others. The cover sheet that goes with a contractor’s submittal package belongs to the submittal workflow, which Fidrel keeps in its own submittal log.