Fidrel

For the estimator

Construction estimator workflow

An estimator builds the number line by line and has to hand it over in a state somebody else can review. This page follows that work in Fidrel: where the lines go, how a line is priced, how markups sit on top, and how to change an estimate after it has been approved.

30 days free · No long-term contract.

Estimating in Fidrel on a laptop, tablet and phone

What slows an estimator down

Rows arrive from everywhere

Quantities come from a drawing, prices from a quote and the structure from last job’s spreadsheet. Retyping loses the source of every figure, and nobody can tell later where a number came from.

Markups hide inside the unit prices

When overhead and profit are folded into each line, changing one percentage means repricing everything, and the reviewer cannot see what you added on top of cost.

The old version is the only backup

Copying a file to keep the previous estimate works until two copies disagree about which one was sent.

Why the order of the markups matters

Markups are calculated in the order they are listed, and each one says whether it applies to the direct costs or to the subtotal above it. Overhead on direct costs and profit on the subtotal give a different total from the reverse, so move them up or down until the order matches how your company prices. A percentage can be at most 1,000, and a deduction at most 100. Because the markups are separate rows, the reviewer reads what you added on top of cost instead of finding it inside every unit price.

Cost estimation
A draft baseline estimate with General Requirements and Concrete groups, quantity, unit price and budget columns, and Submit and Approve buttons

How you change a number after approval

An approved estimate is locked, so the change happens in a revision. Create revision copies the rows and remembers which row each came from, so the revision lines up with the same budget items. The revision is numbered Rev 1, Rev 2 and so on, the approved estimate shows Revision in progress while you work, and Compare with another estimate lists the lines that differ. The reason is typed by the person who approves the revision.

The Import estimate dialog with Source and From fields, six column pickers from code to fixed amount, and a preview of five rows

From blank estimate to submitted

  1. Step 1

    Start the estimate

    Choose New estimate, give it a name and a currency, and start from a Blank estimate or from a copy of an existing one. Pick the type: baseline, alternate, working or forecast estimate. Only the baseline estimate becomes the budget once it is approved.

  2. Step 2

    Build the groups and lines

    Add a group with New group here and put lines inside it, nested as deep as the work needs. Each line has a code, a description, a quantity, a unit, and either a unit price or a fixed amount. To bring in a spreadsheet, paste up to 5,000 rows, or import a CSV or XLSX file of up to 15 MB and pick which column holds which field.

  3. Step 3

    Price the lines

    A unit price can be typed, built up from resources (labor, material, equipment, subcontract and other), or taken from a vendor quote added to the line with Add quote. A quantity can be taken off a drawing sheet or a model, and Fidrel flags the line if the drawing changes afterward.

  4. Step 4

    Add the markups, then submit

    Open Markups and deductions and add general conditions, overhead, contingency or profit as a percentage or an amount, on direct costs or on the subtotal above. Each markup applies to all items or only to chosen ones, with an own percentage on a line if it needs one. Then choose Submit for review and leave a comment if the reviewer needs context.

What an estimator does not get here

Fidrel has no assemblies and no item library; every line is added by hand, pasted or imported, and every price is typed, built up or taken from a quote. A quantity taken off a drawing or a model comes in metric units, and Fidrel does not convert it to feet, square feet or cubic yards. Building and submitting an estimate are for project and organization administrators, and Fidrel does not require a second person to approve: the administrator who builds the estimate holds the finance permissions too.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

For the estimator

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Up to 5,000 rows, one row per line, with code, description, quantity, unit and unit price separated by tabs.