Export project documents as a ZIP file

At the end of a job the owner, the lender or an auditor asks for every current document in its folder, in one file. This page shows how the Export center in Fidrel packs documents, drawings and models into a single ZIP file with the folder structure kept, what limits apply by browser and, just as important, what the ZIP does not contain.

30 days free · No long-term contract.

Fidrel’s documents on a laptop with a floor plan open, a tablet with a version list and a phone showing a drawing

Why closeout archives are painful

Downloading file by file

A finished project holds thousands of files in dozens of folders. Downloaded one folder at a time, the structure is lost, a subfolder is missed and two files with the same name overwrite each other.

Nobody knows which file is current

When several revisions of a drawing sit side by side, the archive does not say which was last. Without a list of numbers, revisions and statuses, the only way to find out is to open each file.

Not everything belongs to every reader

The person exporting may be allowed to read less than the project holds, and a recipient should not receive more than the exporter could see. An export that ignores access either leaks or fails.

What goes into the ZIP

The export holds the current version of each file, in its folder, and you export only what you may read. Earlier versions of a drawing are not packed; they stay in the version history in the project. Files that are not in any folder go into a group named Without a folder. Because the export follows your own access, two people can export the same project and get different archives.

Documents, drawings & models
The Export center in Fidrel, which downloads folders as one ZIP with a CSV list of the files

Size limits and your browser

In Chrome and Edge an archive can hold up to 3.5 GB and 20,000 files, because the browser can write it straight to disk. Other browsers build the file in memory, and an archive there is limited to 100 MB. When the export is too large, the page says an export can hold at most a given size at a time and asks you to choose fewer folders. For a big project, run several exports by folder.

A folder of architectural drawings in Fidrel with each file’s document number under its title, a Rev. column and a status column

From the Export center to a ZIP file

  1. Step 1

    Open the Export center

    The Export center sits beside the Import center. It exports documents, drawings and models as one ZIP file with their folders kept, for sending to others or for keeping.

  2. Step 2

    Choose what to export

    Under What to export, choose Everything you can read here, or Selected folders and tick the folders you want. If you pick selected folders and tick none, the page says to choose at least one folder.

  3. Step 3

    Decide on the list of files

    Tick Include a list of the files (CSV) to add a spreadsheet with the columns Folder, File, Title, Number, Revision, Status and Size in bytes. It is the quickest way to check a closeout set against the drawing register.

  4. Step 4

    Press Export as ZIP

    Fidrel shows how many files it has exported out of the total, and you can Cancel at any time. In Chrome and Edge the archive is written straight to a file you choose; other browsers build it in memory.

  5. Step 5

    Read what could not be included

    If some files could not be read, the page lists them as not in the export. Check that list before you send the archive on, and export those files again or fetch them from the project.

Using the CSV list at closeout

The list names every file with its folder, title, number, revision, status and size. Open it in a spreadsheet and compare it with the drawing register or with the closeout checklist to see what is missing. The number and revision come from the project’s own records, so a mismatch points at a file to fix before handing over.

What the ZIP does not contain

The ZIP holds the current version of each file, so it is not a complete project record: earlier versions, RFIs, meetings and the change log are not in it. Fidrel makes no claim that the archive meets any retention requirement. Files that could not be read are left out and listed instead.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Closeout · Export center

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes. Each file goes in the folder it has in the project, and files without a folder are grouped separately.