Construction closeout software

Closeout is where a good project can still end badly: O&M manuals missing, record drawings out of date, nobody sure the keys were turned over. Fidrel gives the owner and the general contractor one closeout checklist, built on US practice, where each item has a status and can name a responsible party, a due date and a folder.

30 days free · No long-term contract.

Facility management in Fidrel on a laptop, tablet and phone

Why closeout drags on

The turnover list lives in someone’s email

Closeout items are tracked in a spreadsheet or a string of emails between the owner, the contractor and the trades. Weeks after substantial completion nobody can say which O&M manuals are still missing.

Documents arrive, but not where operations needs them

Record drawings, warranties and test reports land in a project folder that the facility team will never open, instead of where the building will be run from.

A checklist built on US closeout practice

The checklist is grouped into eight sections: record documents, operation and maintenance, testing and certificates, warranties, final inspections and sign-offs, owner training, keys and access, and other. On a US project, the template adds sixteen items, from the Certificate of Substantial Completion and the certificate of occupancy to record drawings and specifications, O&M manuals for HVAC and building automation, for electrical and for plumbing, the final commissioning report, test and balance, manufacturer warranties, spare parts, attic stock, training records and the keying schedule.

Operations
A closeout checklist in Fidrel with items approved, submitted and missing, and who approved an item and when

Items with an owner, a date and a folder

Each item records the company or person turning it over, a due date that is flagged overdue once it passes, and notes. An administrator sets up a standard US folder structure, from 01 Closeout and turnover to record documents and O&M manuals, and each item can point to one of those folders and link one project document. Each section counts its items approved or N/A; the progress line leaves N/A items out.

The Export center in Fidrel, which downloads folders as one ZIP with a CSV list of the files

How closeout runs in Fidrel

  1. Step 1

    Start from the US template

    Create the checklist from the template that follows US closeout practice, with record documents, O&M manuals, commissioning and the certificate of occupancy. Items already on the list are skipped.

  2. Step 2

    Collect the documents

    Each item can point to a folder in the facility management area, where the documents are uploaded. The item shows how many documents the folder holds and links straight to the upload.

  3. Step 3

    Approve item by item

    Mark each item Missing, Submitted, Approved or N/A. Approving records who approved it and when, and the progress line counts what is approved, submitted and still missing.

From the project to operations

The current revision of the project’s documents can be copied into facility management. The copy keeps its number and revision and shows when the project has a newer one, so record drawings follow the building instead of staying behind in the project. When it is time to turn everything over, the Export center downloads the facility folders as one ZIP file, with the folder structure intact and a CSV list of the files.

What closeout in Fidrel does not do

There is no compiled O&M binder: no PDF with a cover, table of contents and bookmarks, and the checklist itself cannot be exported or printed. Approving an item is a status with a name and a date, not an e-signature. Contractors cannot check off their own items unless an administrator gives them access to the whole facility management area and permission to manage it. Closeout items send no reminders, and there is no punch-list tool and no COBie export.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Closeout

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Sixteen items: the Certificate of Substantial Completion, the punch list, the certificate of occupancy, record drawings and specifications, three O&M manual items, the systems manual, commissioning and test and balance reports, warranties, spare parts, attic stock, training records and the keying schedule.