Healthcare construction phasing coordination: requests, confirmations and the daily record

Work in an occupied hospital moves one area at a time, and every shutdown, access change and finish task has to be asked for, scheduled, confirmed and written down for the owner and the people who use the space. Fidrel does not replace the owner’s own process. It gives the contractor and the owner’s facilities team one place where those requests, confirmations and daily reports are kept in order.

30 days free · No long-term contract.

The Fidrel daily log on a laptop, tablet and phone, with the day’s reports listed and one report open

What goes wrong in a phased renovation

Requests live in e-mail and nobody has the full list

A shutdown is asked for in one thread, moved in another and confirmed by phone. When the owner asks which areas were offline last month, the answer is a search through inboxes.

Phases overlap in ways the plan did not show

The ceiling work in one wing and the finish work in the next share a corridor. If the two crews do not see each other’s dates, one of them arrives to find the area still closed to them.

Finish tasks are tracked on paper

Small closing tasks per area, such as patching, painting and cleaning before the area is handed back, sit on a clipboard. Nobody can show later who owned a task or when it was done.

The loop as a log of calendar items and tasks

Think of each shutdown as one calendar entry with three states of knowledge. First it is requested, which means the entry exists with its dates and notes. Then it is confirmed, which is the status the person doing the work sets after the owner’s staff have accepted. Finally it is done, or blocked with a reason in the notes. The calendar shows the entries by day, week or month and lists the next fourteen days as an agenda, so the superintendent and the owner’s facilities team read the same plan. Each state change is a change to one record, not a message in a thread.

Site & daily log
Daily reports in Fidrel listed day by day, each with its number, date, title, author and company

Who sees what

Shared calendar entries are visible to everyone in the project, so invite the owner’s facilities staff and the user departments as participants, or as guests who only read and download. The To-do board is narrower: administrators see the whole board and everyone else sees only the tasks that are theirs. The daily report cannot be deleted, and every change to it is logged field by field with the name and the time, which gives the owner a record that cannot quietly change afterward.

One daily report opened in Fidrel with its text, the work and follow-up fields and the history of changes

How to run the request loop in Fidrel

  1. Step 1

    Put each phase and shutdown in the shared calendar

    A project administrator adds an entry of the type Work for the area, with the dates and a notes field that names the system and the people affected. Shared entries are visible to everyone in the project.

  2. Step 2

    Ask the people involved to accept

    Add the participants to the entry. Each of them accepts or declines, and the one doing the work marks it Planned, Confirmed, Done or Blocked as the day approaches and passes.

  3. Step 3

    Give the closing tasks an owner

    On the To-do board an administrator creates a task for each closing item, with one owner, a due date, a priority, a checklist and a label for the area. The owner is notified in Fidrel when it is assigned.

  4. Step 4

    Write the daily report for the area

    Each day the daily report records the work in progress, people on site, equipment, deliveries, delays and safety observations, the work area or location, and photos. Filter the log by location to see one area’s days together.

From a daily report to a corrective item

When a daily report points to a problem, Create NCR fills in the title, text, location and responsible person from the report and links the two in both directions. The NCR has a category, a priority and a corrective action, and it is tracked from open to closed. A change order can then be created from the NCR if scope or cost moves. That chain is the closest Fidrel comes to a phase closeout: each area ends with its tasks done, its NCRs closed and its reports on file.

What this does not do

A shutdown request in Fidrel is a calendar entry with people and a status, not a request form with an approval step. Fidrel does not manage infection control or life-safety measures, and nothing in it states that a requirement of any kind is met. The calendar does not connect to the hospital’s own systems; the only way out is an .ics file. Shared entries are created by project administrators, and the plan for each phase stays as detailed as the people entering it make it.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Phased renovation

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

As calendar entries with dates, participants and a status, and as tasks with an owner and a due date. There is no request form with an approval workflow, so the approval itself still happens in the way your owner requires.