Site operations
Site & daily log
Keep a daily log of what happens on the jobsite: work completed, people on site, deliveries, weather, and delays, with photos from your phone. A daily report that points to a problem becomes an NCR with one tap, and every change is logged.
30 days free · No long-term contract.

The day’s reports
A daily report has a title, time, location, and text, with fields for work in progress, number of people on site, equipment, deliveries, weather, and delays. The log is shown day by day.
From daily report to NCR
“Create NCR” fills in the title, text, location, and responsible person from the report and links the two in both directions. Every change is logged field by field with name and time.
Plan the work in the calendar
The project calendar brings together meetings and planned work by day, week, or month. People assigned to the work accept or decline and mark it confirmed, done, or blocked.
In the field
Write the log where the work happens
Open the daily log on your phone, write the report, and take the photos on the spot. “Take photo” opens the camera, and you can add several files at once.
- “Take photo” opens your phone’s camera
- Photos, PDFs, and documents up to 25 MB
- Filter by date, location, and company

Site & daily log
Frequently asked questions
Anything else on your mind? We are happy to help.
Talk to usThe Daily log has two tabs. The Daily logs tab collects one log per day with manpower, equipment, deliveries, visitors, weather, and delays. The Log entries tab takes work completed, observations, and delays, with photos and files.
Yes. Open the daily log in your phone’s browser, write the report, and take the photos on the spot: Take photo opens the camera. There’s no app to install.
Create NCR fills in the title, text, location, and responsible person from the report and links the two in both directions. A change order can then be created from the NCR.
A daily report can’t be deleted, and every change is logged field by field with name and time. You can always see what was changed and by whom.
Daily reports are shown day by day with the most recent first. Search by title and filter by author, location, company, date, and status.
Explore more of Fidrel
In depth
One project. One subscription. The entire platform included.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.
- 30 days free
- Unlimited participants
- No minimum term





