Bid evaluation criteria for construction

Bids have to be compared on the same weighted criteria, and the choice has to be written down with its reason. This page treats the evaluation as a document: the criteria and their weights, the 0 to 5 scale, how the total and the rank are worked out, and what Fidrel records when the award is made. It also says what the sheet leaves out.

30 days free · No long-term contract.

The bid request in Fidrel on a laptop, tablet and phone: the evaluation table and the companies invited to a request for bids

Where evaluation sheets fail

The weights change after the bids are in

Criteria written down only after the numbers are known tend to favor the bid someone already preferred. The sheet has to exist, with its weights, before anyone scores a bid.

Price points that nobody can reproduce

When price is scored by a formula in one person’s spreadsheet, a second reader cannot check it. A rule everyone can restate, from the lowest responsive bid, is easier to defend.

A decision with no reason attached

Months later someone asks why the second-ranked bidder won. The score is in one file, the discussion in a meeting, and the reason in nobody’s notes.

What each criterion needs

A criterion has a name of up to 120 characters, a type, a weight above 0 and at most 100, and an optional description of what is judged and how points are given. Only one criterion can be about price. The standard setup is a starting point: Price at 60, Qualifications and approach at 25 and Schedule at 15. Rename them and change the weights to fit the project, as long as the total stays 100. Criteria can be set up while the bids are still sealed. Once an award is made they are locked, and you must rescind the award to change them.

Procurement
Bid evaluation in Fidrel with weighted criteria for price, schedule and safety and a bid tabulation in dollars

How the points and the rank are worked out

Price is scored against the lowest responsive bid: that bid earns the full weight, and any other bid earns the weight multiplied by the lowest amount and divided by its own. A bid 25 percent above the lowest therefore earns 48 of 60 points. A quality criterion earns its weight times the score divided by 5, so a 4 on a weight of 25 is 20 points. The total is the sum, and bids are ranked from highest to lowest. Equal totals share a rank. A bid is ranked only when it is responsive and every criterion has a value; the rest are shown as Incomplete.

A bid request in Fidrel with its bid deadline, the bidders and the note that each bidder creates an account

Building the criteria sheet and scoring the bids

  1. Step 1

    Set the criteria and weights

    Open Bid evaluation in the bid request and find Evaluation criteria. Use a standard setup or Add criterion. Give each a name, a Type of Price or Quality, a Weight (%) and an optional description. The weights must add up to 100%. Then choose Save criteria.

  2. Step 2

    Enter amounts and scores in the tabulation

    After the bids open, the Bid tabulation lists the bidders. Enter each Bid amount and a score from 0 to 5 for every quality criterion. Scores are saved, and a comment can be added to explain a score.

  3. Step 3

    Mark non-responsive bids

    If a bid does not respond to the request, choose Reject bid and give a Reason, for example a missing bid bond. A rejected bid is not ranked and cannot be awarded, and the reason stays with the evaluation.

  4. Step 4

    Award and print the report

    Read the total score and rank, choose Award the bid and add a justification if you are not choosing the top-ranked bid. Then use Export to Excel, or the Bid evaluation report, which prints with lines for signature, printed name and date.

Recording the decision

The award is chosen from responsive bidders who have submitted a bid, after the bid deadline or once the request is closed. Choosing a bid that is not top-ranked prompts you to explain the decision; the justification is optional but the prompt is there. The decision is saved with the date and who made it, and it can be rescinded, which keeps the evaluation and lets a new decision be made. The exported Bid evaluation report puts the criteria, the scores and the award on one page with signature lines to fill in.

What the evaluation sheet is not

This is a weighted sheet for the owner’s own evaluation, not a comparison of line items. The evaluator enters one total per bidder, so Fidrel does not do bid leveling and does not set line-item prices side by side. There is one shared score per criterion rather than a score from each evaluator. Nothing is sent to bidders when the award is saved, so no notice of award goes out. Fidrel makes no claim to meet any public procurement rule and gives no legal advice about how an award must be made.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Bid evaluation

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

The factors an owner uses to compare bids, such as price, qualifications and schedule, each with a weight. In Fidrel the weights add up to 100% and each quality criterion is scored from 0 to 5.