Fidrel

Folder template

Construction project folder structure for a building project

A job runs better when RFIs, contracts, specifications, drawings and closeout each have an obvious home from the first week. This page walks through the folder tree Fidrel offers a US building project, why it mixes project phases with document types, and how to restrict a folder.

30 days free · No long-term contract.

Project documents in Fidrel on a laptop, tablet and phone, showing a PDF drawing and its revisions

Why every job ends up with its own tree

Each project manager invents a new tree

Without a master structure, one job files bids under Preconstruction and the next under Procurement. Nobody can find an addendum on a project they did not set up, and a controller who moves between jobs relearns the layout every time.

Phases or document types, and not both

A tree by phase hides the contract from the person who needs it in the field, while a tree by document type scatters one stage of work across ten folders. Most jobs need a bit of each, and decide it badly in a hurry.

Folders everybody can open

The budget folder is created next to the drawings and inherits the same access, so a subcontractor on the drawings can also read the owner’s figures. The restriction is an afterthought, if it happens at all.

The top level of the US tree

The prepared project tree has 23 top-level folders. The US edition puts Owner’s project requirements, Contracts and Permits and AHJ approvals first, then RFIs, Inspections and closeout, Specifications, Images and CAD files. After those come the design and bidding stages, Design deliverables, Design development, Bid documents and Addenda, followed by Drawing and document indexes, Quality, environmental and safety, Memos and studies, Meeting minutes, Drawings, Schedule, Construction documents, Record documents, Closeout, O&M manuals and warranties, and Archive and records retention. Under Drawings sit the disciplines: Architecture, Structural engineering, Mechanical and plumbing, Electrical and more.

Documents, drawings & models
The Documents page in Fidrel with the folder tree on the left, an Architecture folder open and its drawings listed with revision and status

By phase or by document type

The tree answers the question both ways on purpose. The folders you work in all day, such as Drawings, Specifications and Contracts, are by document type, so the foreman and the estimator find them in the same place on every job. The folders that change character over time, such as Design development, Construction documents, Record documents and Closeout, are by phase, so a handover package is already collected when it is needed. If you prefer one rule, use the empty structure and build to it.

The Export center in Fidrel, which downloads folders as one ZIP with a CSV list of the files

Setting up the tree in Fidrel

  1. Step 1

    Choose prepared folders or an empty structure

    When the project is created you choose Prepared folders for the US edition, with a Folder preview of every folder, or Custom structure – start empty if your company already has a tree it wants to build by hand.

  2. Step 2

    Read the preview before you add it

    The preview lists the top-level folders and their subfolders, and marks the ones that are administrators only by default. Adjust names and add your own folders afterwards; nothing in the tree is locked.

  3. Step 3

    Add folders later without losing work

    On an existing project open Ready-made folder templates and choose Add folders. It adds only the missing folders, existing files and permissions stay unchanged, and any new sensitive folder is visible to administrators only.

  4. Step 4

    Restrict what needs it

    Lock a folder or a single document to selected people when a subfolder holds something only part of the team should read, such as pricing, and keep the rest open to the project.

Restricting a folder

Finance and budget is created as a restricted folder: it is marked with a shield in the preview and visible to administrators only by default. For any other folder, lock it to selected people from the folder’s access settings. Everyone who can open a file gets a notification when it is uploaded, so restrict before you upload, not after.

What the template does not do

The prepared folders are an adaptable starting structure, not a certification of legal or standards compliance, and Fidrel does not stand in for any public agency’s records system. Adding a template never renames, moves or deletes a folder that already exists, so a tree you have already shaped is left as it is. Fidrel does not number folders for you, and it does not build the folder tree from your specification book.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term

Folder template

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Yes. Choose Custom structure – start empty when the project is created and build the folders you want, or add the prepared folders later and rename or add to them. Nothing in the tree is fixed.