Fidrel

Fidrel — Construction field software for project teams

  • Owners
  • Engineers
  • Public agencies
  • General contractors
  • Architects
  • Developers
  • Construction managers
  • Subcontractors

Find drawings, documents, and project questions in Fidrel on your phone. Share the information field and office teams need.

Prepare the operation

The project system of tomorrow. For every discipline.

Check the scope, drawings and practical prerequisites before starting work.

Test document viewing on the devices used in the field and confirm that the current revision is identifiable.

Verify device access

Talk to us
The Fidrel advantage

Record constraints

Locate the obstacle and affected work. Route the question to someone able to obtain a decision.

Bring completed work, issues and changed conditions into the next coordination discussion.

Explore the platform

01 / 05

Prepare the operation

Check the scope, drawings and practical prerequisites before starting work.

View our plans
Fidrel project overview, schedule and drawing viewer on a computer, tablet and phone.

Your whole project. Wherever you are.

From planning in the office to drawings on the jobsite. Fidrel brings your project documents, schedule and information together in the browser – on your computer, tablet and phone. Create your account and bring the team together around the same information, wherever you work.

0+

project participants prepared in one shared environment

0 MB

per document upload

0+

items per structured import

0/7

access to project information

Ready for a clearer project?

Tell us how you work today. We will show you how Fidrel can fit your project and organization. Together, we map the information flows, responsibilities and the first areas worth simplifying.

Get in touch

Frequently asked questions

What needs checking before work begins?+

Current documents, responsibility and the access or work prerequisites for the operation.

Should teams assume offline access?+

No. Verify available functions and plan for the connection actually available on site.

What should be checked before an operation starts?+

Check the scope, drawings and practical prerequisites before starting work.

What should be checked when using documents on mobile devices?+

Test document viewing on the devices used in the field and confirm that the current revision is identifiable.

How should jobsite constraints be recorded?+

Locate the obstacle and affected work. Route the question to someone able to obtain a decision.