Site operations
Site attendance
See who’s on site right now. Everyone checks in and out with one tap on their phone, and the project gets a list of who’s on site and a history of completed visits.
30 days free · No long-term contract.

One tap in, one tap out
The “Check in” button starts the visit, and the card shows when you checked in and how long you’ve been on site. “Check out” ends it.
On site now
The list shows who’s checked in and since when. A project administrator can check out someone who forgot to.
A history of visits
Completed visits are listed with date, name, time in and out, and duration, most recent first.
In the field
Checked in within a second
On a phone, check-in sits at the top of the page, with a full-width button. Below it are the list of who’s on site and the history.
- Everyone checks themselves in
- Everyone on the project sees who’s on site
- Doesn’t replace your safety program’s sign-in sheet

Site attendance
Frequently asked questions
Anything else on your mind? We are happy to help.
Talk to usEveryone checks themselves in with the Check in button, on a phone or a computer. The card shows when you checked in and how long you’ve been on site, and Check out ends the visit.
Everyone on the project sees the list of who’s checked in and since when, and the history of completed visits.
A project administrator can check out someone who forgot to. Nobody can check anyone else in.
Date, name, time in and out, and the duration of the visit, with the most recent visits first. The register holds only the person and the times.
No. An account on the project and a phone or a computer are all you need. Site attendance is the project’s own overview and doesn’t replace your safety program’s sign-in sheet.
Explore more of Fidrel
One project. One subscription. The entire platform included.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.
- 30 days free
- Unlimited participants
- No minimum term





