Fidrel

Site operations

Inspections & quality

Plan inspections, record the result, and follow up on what didn’t pass. An inspection has a responsible person, a due date, a result, and photos, and a failed inspection becomes an NCR with one tap. The NCR is then tracked through to closure.

30 days free · No long-term contract.

Screenshot from Fidrel: Inspections & quality
  1. The inspection and its result

    Every inspection has a type, date, location, responsible person, and due date, plus a result: passed, remarks, or failed. Status moves from planned to performed and approved.

  2. From inspection to NCR

    “Create NCR” fills in the title, text, location, and responsible person from the inspection and links the two. The NCR has a category, a priority, and a corrective action and is tracked from open to closed.

  3. Responsible person notified

    Whoever is made responsible for an inspection or an NCR gets a notification in Fidrel, and the open work shows up under “Assigned to me” on the Home page.

Screenshot from Fidrel: Inspections
  • Bechtel
  • Fluor
  • AECOM
  • Jacobs
  • CBRE
  • JLL
  • Cushman & Wakefield
  • BGRE

In the field

The inspection is documented with photos

Open the inspection on your phone, take the photos with the camera, and enter the result. The photos show up as thumbnails in the record, and every change is logged with name and time.

  • “Take photo” opens your phone’s camera
  • A result and remarks on every inspection
  • NCRs can also be created from the 3D model
Screenshot from Fidrel: The inspection is documented with photos

Inspections & quality

Frequently asked questions

Anything else on your mind? We are happy to help.

Talk to us

Title, date, location, description, photos and files, company, responsible person and due date, inspection type, who checked it, result, and remarks.

One project. One subscription. The entire platform included.

Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.

  • 30 days free
  • Unlimited participants
  • No minimum term