Site operations
Site forms
Turn quality checks and inspections into forms that are filled out in the field. Build templates with check items, fill them out on your phone, and submit. A submitted form is locked and can’t be changed afterward.
30 days free · No long-term contract.

Templates with check items
A template has four kinds of check items: a check (Pass, Fail, or N/A), text, number, and date. Start from the standard templates for your market or build your own.
Fill out and submit
Choose a template, enter the location and who performed the check, and answer item by item. Drafts are saved, and required items must be answered before the form is submitted.
A locked record
A submitted form is locked for everyone, administrators included, and carries its own copy of the check items. The list shows how many deficiencies each form contains.
In the field
Three buttons per check item
On a phone, each item stands on its own with the “Pass,” “Fail,” and “N/A” buttons below it. Text, numbers, and dates go in fields that fill the width of the screen.
- Drafts and submitted forms kept apart
- Search by form, location, or inspector
- Deficiencies counted in the list

Yes. Build your own templates with check items, where each item has a heading and a type and can be required, or start from the standard templates for your market and change them.
Four: a check answered Pass, Fail, or N/A, plus text, number, and date.
Choose a template, enter the location and who performed the check, and answer item by item. On a phone, each item stands on its own with the Pass, Fail, and N/A buttons below it. Drafts are saved, and required items must be answered before the form is submitted.
No. A submitted form is locked for everyone, administrators included, and carries its own copy of the check items. A later change to the template doesn’t affect it.
The list shows the number, template, location, inspector, the number of items answered Fail, the status, and the date. Search by form, location, or inspector and filter by template.
Explore more of Fidrel
One project. One subscription. The entire platform included.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.
- 30 days free
- Unlimited participants
- No minimum term





