Documents & drawings
Documents, drawings & models
All the project’s files in one folder structure, with preview and version history. Upload a new issue and it becomes a new version of the same document, while the earlier ones are kept. PDFs, images, Office files and DWG drawings open directly in the browser.
30 days free · No minimum term.

New file, new version
Document number, title and revision are read from the file name. If the number already exists, the file becomes a new version of the same document, and an identical file is skipped. Every version is kept with its date and change note.
Open without downloading
PDFs, images, Word, Excel, PowerPoint and DWG files are shown in the browser. Open several files in tabs or two side by side, and search the text of a PDF.
The right people, the right folders
Lock a folder or a document to selected people. Everyone who may open a file receives a notification and an email when it is uploaded, and deleted files can be restored for 30 days.
On site
Drawings in your pocket
Browse the folders, search by number or title and open the latest version on your phone. The status shows whether the document is work in progress, for review and comment or published for construction.
- Search by title, number and discipline
- Most recently changed files first
- Zoom and page through PDFs and drawings

Documents, drawings & models
Frequently asked questions
Anything else on your mind? We are happy to help.
Talk to usPDFs, images, Word, Excel, PowerPoint, DWG and DXF files are shown without being downloaded. Open several files in tabs or two side by side.
Document number, title and revision are read from the file name. If the number already exists, the file becomes a new version of the same document, and all earlier versions are kept with their date and change note.
Search by title, number, discipline, type and file name. In an open PDF you can also search the text of the document.
Yes. Lock a folder or a document to selected people. Everyone who may open a file receives a notification and an email when it is uploaded, unless they have switched that off.
Deleted files and folders can be restored for 30 days.
Explore more of Fidrel
One project. One subscription. The entire platform included.
Your trial applies to your first own project and starts when that project is created. No card required. Afterwards, choose card or invoice to continue.
- 30 days free
- Unlimited participants
- No minimum term





